Sculpture I / Positives and the Multiple
Practice question · Put in order

Arrange the stages of producing a cast positive in order.

Hints
  1. Preparation of the mould comes before any mixing.
  2. Seam cleaning is the last operation.
Show the answer
  1. Check the mould is clean, dry and correctly assembled
  2. Apply release agent if the material pair requires it
  3. Mix the casting material to its stated ratio
  4. Introduce it so that air can escape
  5. Demould once set, then clean the seams
Why

The fourth step carries most of the failures. Pouring without a path for the air produces a cast with a region simply missing, and the fix is a vent, which has to be built into the mould long before this stage.

Read the lesson: Positives and the Multiple →

Practise Positives and the Multiple

The app has 5 more questions on this lesson, and keeps your place in the course. Sculpture I is free to start.

More questions on Positives and the Multiple